EES guidelines
In 2002, the Minister for Planning
determined that the Port of Melbourne Corporation (PoMC) was
required to complete an Environment Effects Statement (EES) for the
Port Phillip Channel Deepening Project, in line with the
Environment Effects Act 1978 (Vic)
.
The Department of Infrastructure (DoI) prepared draft Scoping
Guidelines, setting out the matters that needed to be investigated
and documented by the PoMC. The DoI invited public comment on the
draft guidelines. Following a public comment period the Scoping
Guidelines were finalised and may be viewed at the links below.
EES Assessment Guidelines (PDF, 238kb) EES Assessment Guidelines Appendix
(PDF, 150kb)
|