Channel Deepening Project
  
  Contact us
  
  FAQ's
   
  Useful links

  A to Z index
  
 Community Information
 Program
 

 

Home > Publications > 

Technical Reports

The following are technical reports as listed in Apprendix 1 (page 100) of Quarterly Project Report No. 2
To view Quarterly Project Reports please click here>>

 

Report Name

PDF
File size

Released

Acevedo, S., Jenkins, G. and Harris, A. (2008). Baywide egg and larval surveys subprogram, Progress Report No. 1 (Nov2007-Jan 2008). Fisheries Victoria. Technical Report No. 10. Department of Primary Industries, Queenscliff, Victoria, Australia. 7pp.

287kb Sept 2008

BASSET (2008a) Boskalis - Channel Deepening Project Works - Yarra River - West Gate Bridge to Swanson Dock. MA0714 06/06/08

766kb Sept 2008

BASSET (2008b) Boskalis Channel Deepening Project - Appleton Swinging Basin MA0714 06/06/08

140kb Sept 2008

Basset (2008c) Boskalis – Channel Deepening Project Works – Piling noise from Swanson Wharf East, wharf reinforcement. MA0710. 24/6/2008

64kb Sept 2008

Basset (2008d) Boskalis – Channel Deepening Project Works – 32 South Wharf piling operations noise, Junttan HHK 7/9AS hammer. MA0710 11/7/2008

205kb Sept 2008

Basset (2008e) Boskalis – Channel Deepening Project Works – Initial noise measurements of Swanson Dock East piling with IHC hammer. MA0710. 14/7/2008

112kb Sept  2008

Basset (2008f) Boskalis – Channel Deepening Project Works – CoZa dredging in Yarra River and Hobsons Bay, Report MA0714. 31/7/2008

160kb Sept  2008

Basset (2008g) Boskalis – Channel Deepening Project Works – Storken dredging in Yarraville to Newport in Holden Dock, Report MA0714: 4/8/2008

197kb Sept 2008

Basset (2008h) Basset (2008g) Boskalis – Channel Deepening Project Works – Desktop review of the potential evening/night-time noise impacts from the piling operations at Sawnston Dock East. MA0710. 14/7/2008

106kb Sept 2008

BL&A (2008a) Channel Deepening Project – Baseline Monitoring of Saltmarsh Extent at Port Phillip Bay. Report No. 8005 (4.3). July. Brett Lane & Associates

4mb Sept 2008

BL&A (2008b) Channel Deepening Project – Baseline Monitoring of Saltmarsh Health at Port Phillip Bay. Report No. 8005 (3.5). July. Brett Lane & Associates

3.5mb Sept  2008

BL&A (2008c) Channel Deepening Project – Baseline Monitoring of Mudflat Extent at Port Phillip Bay. Report No. 8005 (2.6). July. Brett Lane & Associates

5.8mb Sept 2008

Conron, S., N. Bridge, K. Ryan, D, Grixti (2008) Baywide Recreational Fishery Surveys Sub-Program – Progress Report No.1 (January – April 2008). Fisheries Victoria. Technical Report Series No. 9.

706kb Sept 2008

CMST (2008a) Port of Melbourne, East Swanson Dock impact pile driving underwater noise, Curtin University – Centre of Marine Science and Technology. 9-10 May 2008.

462kb

Sept 2008

 Back to top>>

Report Name

PDF
File size

Released

CMST (2008b) Port of Melbourne, East Swanson Dock impact pile driving underwater noise, Curtin University – Centre of Marine Science and Technology. 5 July 2008.

1.1mb Sept 2008

DPI (2008) Baywide Port Phillip Bay Annual Trawl Sub-Program, Milestone Report #1 (July 2008). Fisheries Victoria Research Report Series No. 3.

762kb Sept  2008

DSE (2008) Baywide Little Penguin Monitoring Program Quarterly Report 1 (Jan.-June) July 2008.

284kb Sept  2008

EPA (2008a) Baywide Water Quality Monitoring Program: Progress Report No.5 (May 2008).

271kb Sept  2008

EPA (2008b) Baywide Water Quality Monitoring Program: Progress Report No.6 (June 2008).

307kb Sept  2008

EPA (2008c) Baywide Water Quality Monitoring Program: Progress Report No.7 (July 2008).

306kb Sept 2008

EPA (2008d) Baywide Water Quality Monitoring Program - Milestone Report No. 1. July 2008

3.7mb Sept 2008

Jenkins, G. and Smith, T. (2008). Baywide Monitoring of Key Fishery Species in Seagrass Beds Sub-program.  Progress Report No. 1 (April 2008), July 2008. Technical Report No. 7, Fisheries Victoria, June 2008. Department of Primary Industries, Queenscliff, Victoria, Australia. 12pp.

499kb Sept 2008

Longmore A. R. (2008a) Baywide Nutrient Cycling (Denitrification) Monitoring Program – in situ Loggers. Progress Report No. 2 (Feb. 2008 – April 2008). Fisheries Victoria, May 2008. Department of Primary Industries, Queenscliff, Victoria, Australia.

4.1mb Sept  2008

Longmore, A. R. (2008b) Baywide Nutrient Cycling (Denitrification) Monitoring Program – benthic fluxes. Progress Report No. 3 (Feb. 2008 – April 2008). Fisheries Victoria, May 2008. Department of Primary Industries, Queenscliff, Victoria, Australia

1.3mb Sept  2008

Longmore A. R. and Nicholson G. (2008) Baywide Nutrient Cycling (Denitrification) Monitoring Program - Milestone Report No. 1 (Dec.–Apr. 2008). Technical Report No. 8, Fisheries Victoria, July 2008. Department of Primary Industries, Queenscliff, Victoria, Australia. 26 pp.

3.7mb Sept 2008

PoMC (2008a) Minutes for the Community Liaison Group (CLG) meeting – 15 May 2008a.

625kb Sept  2008

PoMC (2008b) Minutes for the Community Liaison Group (CLG) meeting – 24 July 2008

1.7mb

Oct
2008

PoMC (2008c) Minutes for the Dive Industry Liaison Group (DILG) meeting – 13 May 2008

136kb

Oct
2008

Back to top>>

Report Name

PDF
File size

Released

PoMC (2008d) Pre-start audit – CoZa – (Port Melbourne Channel). May 2008.

1.1mb Sept  2008

PoMC (2008e) Pre-start audit – Berthworks (Swanson Dock East). May 2008

1mb Sept 2008

PoMC (2008f) Pre-start audit – Berthworks – CoZa (Yarra River and Hobsons Bay). May 2008

1.1mb Sept  2008

PoMC (2008g) Pre-start audit – Berthworks (Yarraville to Newport Park inc. Holden Dock). June 2008

1mb Sept  2008

PoMC (2008h) Pre-start audit – Berthworks (Gellibrand Pier). July 2008

1mb Sept 2008

PoMC (2008i) Pre-start audit – Storken (Yarra River and Hobsons Bay). July 2008

1.1mb Sept 2008

PoMC (2008j) EMP audit – Goomai  (Yarra River). May 2008

1.2mb Sept 2008

PoMC (2008k) EMP audit – CoZa  (Port Melbourne Channel). May 2008

900kb Sept 2008

PoMC (2008l) EMP audit – Berthworks (Swanson Dock West and 32 South Wharf). June 2008

1.2mb Sept 2008

PoMC (2008m) EMP audit – Queen of the Netherlands – Entrance. July 2008

1.2mb Sept 2008

PoMC (2008n) EMP audit – Berthworks (Swanson Dock East). July 2008

1.2mb Sept  2008

PoMC (2008o) EMP audit – CoZa – Yarra River and Hobsons Bay. July 2008

1.4mb Sept  2008

PoMC (2008p) Water Quality Progress Report 5 & 6 – Assessment of results outside of expected variability. 5 August 2008.

157kb Sept 2008

PoMC (2008q) Baywide Water Quality Monitoring program - Progress Report No.1 - 6 (November 2007 -June 2008) – Zinc & Ammonium Assessment. 2 Sept. 2008

1.4mb Sept 2008

PoMC (2008r) Algal Bloom Quarterly Report 2 Final Report. 8 August 2008 .

741kb Sept 2008

PoMC (2008s) Nutrient cycling (Algal Blooms) Progress Report 2 – Assessment of results outside of expected variability.  11 July

265kb Sept  2008

PoMC (2008t) Port of Melbourne Corporation – Plume Intensity and Extent Quarterly Report No.2. August 2008

3.8mb Sept 2008

PoMC (2008u) Minutes for the Interim Management Review for Environmental Monitoring – Plume Intensity and Extent – 23 July 2008.

139kb Sept 2008

PoMC (2008v) Minutes for the Entrance Management Review – 4 June 2008

669kb

Sept 2008

Addendum Report:
BASSET (2008i) Initial noise measurements of 32 South Wharf and Swanston Dock East piling operations

659kb

Nov
2008

Back to top>>

September 2008