The Port of Melbourne Corporation recognises that
Port Phillip Bay is not only Victoria’s gateway to more
than 300 international markets but also one of the state’s key
natural and recreational assets.
Over two years of investigation into these assets has
resulted in the development of the Supplementary Environment
Effects Statement (SEES). As part of the SEES process,
detailed studies into the existing conditions of the bays
natural assets and assessment of potential impacts from
project works were undertaken.
The outcome of these studies, plus a detailed risk
assessment, played an integral part in the development of the
project, including technology selection, work methods and the
development of the Environmental Management Plan (EMP) and
monitoring program.
The EMP prepared by the Port of
Melbourne Corporation sets out the environmental
safeguards required to protect bay assets during
dredging. It consists of a combination of regulatory
controls, environmental controls, project delivery standards
and environmental monitoring to do this.
Importantly, the EMP will be subject to continual audit and
review to ensure that its aim of minimising environmental
impacts is achieved.
The EMP, detailed designs and method
statements are available on this page.
For further information on baywide environmental monitoring click
here.
To view the latest turbidity
monitoring results please click here.
To view archived versions of the EMP
please click here.
|
In this section
Environmental Management Plan (EMP) -
Rev 5 (PDF, 8.2
Mb)
Summary of changes - EMP Rev
5
(PDF, 164kb)
EMP Compliance
Entrance
Dredging
Turbidity monitoring
results
Incident Report - Entrance
Dredging (PDF, 11.75mb - large file)
Associated Procedures
Turbidity detailed design
(PDF, 936 Kb)
Underwater
noise detailed design
(PDF, 2.9
Mb)
Airborne
noise detailed design
(PDF, 5.2
Mb)
Method statement for material placement in PoM
DMG Rev 1
(PDF, 669kb) Summary of changes - Rev 1 (PDF, 100kb)
Method statement for dredging works in North of
Bay -Contaminated
(PDF, 306 Kb)
Method statement for dredging works in South of
Bay - Entrance Rev1
(PDF, 397 Kb)
Summary of changes - Rev 1 (PDF,
121kb))
|