The Channel Deepening Project, once completed, will provide
vessels calling at the Port of Melbourne with 14m draught
access at all tides. To achieve this, dredging and associated works
will be required in parts of the existing shipping channels within
Port Phillip Bay.
The areas to be dredge are indicated in green on the map
below.
The project also includes associated
works such as:
- placement of dredge material in two Dredge
Material Grounds within the bay
- modification to existing berths
in the Port of Melbourne
- bank stabilisation
- expansion of the ship swinging basin in the
Yarra River
- installation of new navigational aids, and
- protection of service pipelines which pass under
the Yarra River.
The Statement of Intent which outlines PoMC's
commitments for delivering the Channel Deepning Project can be found
here.
|